Your home has more potential than you think. Download your free guide and discover what's possible: four real projects, insights from a RIBA Chartered Architect. Click to get the Free Guide
Accessible Home Design: An Architect's Guide
An accessible home is decided on the drawing: level access, wider doors, bedrooms off the living space, a garden you can reach without a step. What Building Regulations require and where to go further, with an accessible bungalow in Coventry as the example.
What Your Architect Wishes You Knew Before Building a Home
Five things I wish every client knew before we start designing their home: how they really live, why design goes round more than once, letting your architect challenge the brief, setting a clear budget, and why nobody can promise a fixed timeline.
How to Build Your Dream Home in Rural England: 6 Planning Routes
Most refusals I see come down to the wrong planning route, not a hopeless site. Six routes to a home in rural England: HO11, DP3, rural worker homes, Green Belt, grey belt and Class Q. And what to do when a home isn’t possible.
Self-Build Eco-Home Funding: Mortgages, Grants and What Your Architect Needs to Tell You
Eco-homes often fall outside standard mortgage criteria, and less familiar materials such as hemp or straw narrow the list of lenders. How self-build mortgages work, what your architect can do to help, the mistakes that derail funding, and where grants help.
See Your Home Before It’s Built: Why Physical Models Still Matter
Why we still build physical models, from early massing studies to a full-size 1:1 mock-up of the Monocoque Cabin’s shingles. When a model is most useful, and what clients see in one that a screen misses.
RIBA Plan of Work: Simple Guide
The eight RIBA Plan of Work stages explained for self-builds and extensions, from Stage 0 to Stage 7. Why they are worth using on a small project, and how we deliver them in four steps.
Eco-Home Build Costs UK: An Architect's Honest Breakdown
What an eco-home costs to build in the UK per m², set against a standard build and Passivhaus, with 150 m² and 200 m² examples. A full energy strategy can pay for itself within 7 to 13 years.
Holiday Let and Eco-Home Viability: Getting the Site Right Before You Buy
The plot looks perfect until you can’t get planning, or the grid connection costs £200k. What land costs, why you should always buy subject to planning, and whether to build off-grid or connect to utilities.
Architect as Developer: Lessons From Srinagar to the Monocoque Cabin
My interest in working as both architect and developer began at 21, with a project in Srinagar, Kashmir. What I have learnt since, up to the Monocoque Cabin, about funding, risk and black swan events.